Kew Towpath, london
PROJECT OVERVIEW
This project involved the replacement of 120m of existing revetment which was collapsing, with sheet piles at the toe of the revetment, no fines in situ concrete for drainage, and nearly 150 precast concrete panels placed on the no fines concrete with soil anchors driven through the precast concrete panels..